
Kinross Gold Corporation
Kinross Gold
Kinross Gold Corporation is a Toronto-based senior gold producer with six operating mining complexes across the United States, Brazil, Mauritania, Chile and Canada. Founded in 1993, it employs 7,100 people and carries a market value of 24.53 USD bn at a share price of 27.82 CAD. FY2025 attributable gold production of 1.97 Moz and silver of 2.77 Moz generated revenue of 7.0511 USD bn, operating income of 3.2776 USD bn and net income of 2.3901 USD bn, against total assets of 12.4111 USD bn and equity of 8.6941 USD bn. Two assets do most of the work: Paracatu in Minas Gerais, the largest open pit in the group at 0.58 Moz, and Tasiast in Mauritania at 0.55 Moz with a 24,000 tonne per day mill behind it. Together they deliver more than half of output. The rest of the book is a mix of Alaskan and Nevadan open pits, Fort Knox at 0.38 Moz fed partly by the 70%-owned Manh Choh satellite, Round Mountain at 0.22 Moz, Bald Mountain at 0.18 Moz and La Coipa in Chile at 0.2 Moz. The development pipeline runs through Great Bear in Ontario, a 0.5 Moz project targeting late-2029 startup.
Strengths: Cash generation moved sharply in FY2025. Revenue rose from 5.1488 USD bn to 7.0511 USD bn while net income went from 0.9488 USD bn to 2.3901 USD bn, so the increment landed almost entirely at the bottom line. Realised gold of 3,423 USD/oz tracked the LBMA Gold Price PM within 0.2%, and there is no gold hedging at all, meaning spot moves reach earnings without a cap. The exposure is deliberate: management hedges foreign currency exposures in BRL, CLP and CAD and roughly 50% of 2027 oil, leaving the gold leg open. Balance sheet leverage is modest for a producer this size, with 3.717 USD bn of liabilities against 12.4111 USD bn of assets, which is a lighter structure than most senior peers carry. Silver is not incidental either, at 1.6% of revenue or 0.1142 USD bn, with La Coipa the main source. Great Bear adds a 0.5 Moz Canadian project to a portfolio otherwise weighted toward the Americas south of the border and one West African asset, giving the company a domestic growth option it did not have five years ago.
Weaknesses: Reserve quality is the structural weak point. The 20.9 Moz gold reserve sits at a grade of 0.85 g/t with a 10-year mine life, the thinnest combination among the senior producers covered here, which means tonnes rather than grade must do the work and any dilution bites directly into cost per ounce. Mine life of a decade leaves little margin for a delayed development project, and Great Bear does not pour gold until late 2029. The FY2026 guidance is the more immediate warning: output is guided to 1.84 to 1.86 Moz, below the 1.97 Moz delivered in FY2025, while all-in sustaining cost is guided to 1,850 to 1,900 USD/oz against 1,571 USD/oz in FY2025. Capex rises from 1.1752 USD bn attributable in FY2025 to 1.5 USD bn plus or minus 5% in FY2026, so the company is spending more, producing less and carrying a higher unit cost into the next year. Jurisdiction adds a second layer: Tasiast at 0.55 Moz is the only operating asset outside the OECD, and it is also the highest-margin mine in the portfolio, a pairing that concentrates both return and risk in one country.
閱讀更多收起
Kinross Gold Corporation is a Toronto-based senior gold producer with six operating mining complexes across the United States, Brazil, Mauritania, Chile and Canada. Founded in 1993, it employs 7,100 people and carries a market value of 24.53 USD bn at a share price of 27.82 CAD. FY2025 attributable gold production of 1.97 Moz and silver of 2.77 Moz generated revenue of 7.0511 USD bn, operating income of 3.2776 USD bn and net income of 2.3901 USD bn, against total assets of 12.4111 USD bn and equity of 8.6941 USD bn. Two assets do most of the work: Paracatu in Minas Gerais, the largest open pit in the group at 0.58 Moz, and Tasiast in Mauritania at 0.55 Moz with a 24,000 tonne per day mill behind it. Together they deliver more than half of output. The rest of the book is a mix of Alaskan and Nevadan open pits, Fort Knox at 0.38 Moz fed partly by the 70%-owned Manh Choh satellite, Round Mountain at 0.22 Moz, Bald Mountain at 0.18 Moz and La Coipa in Chile at 0.2 Moz. The development pipeline runs through Great Bear in Ontario, a 0.5 Moz project targeting late-2029 startup.
Strengths: Cash generation moved sharply in FY2025. Revenue rose from 5.1488 USD bn to 7.0511 USD bn while net income went from 0.9488 USD bn to 2.3901 USD bn, so the increment landed almost entirely at the bottom line. Realised gold of 3,423 USD/oz tracked the LBMA Gold Price PM within 0.2%, and there is no gold hedging at all, meaning spot moves reach earnings without a cap. The exposure is deliberate: management hedges foreign currency exposures in BRL, CLP and CAD and roughly 50% of 2027 oil, leaving the gold leg open. Balance sheet leverage is modest for a producer this size, with 3.717 USD bn of liabilities against 12.4111 USD bn of assets, which is a lighter structure than most senior peers carry. Silver is not incidental either, at 1.6% of revenue or 0.1142 USD bn, with La Coipa the main source. Great Bear adds a 0.5 Moz Canadian project to a portfolio otherwise weighted toward the Americas south of the border and one West African asset, giving the company a domestic growth option it did not have five years ago.
Weaknesses: Reserve quality is the structural weak point. The 20.9 Moz gold reserve sits at a grade of 0.85 g/t with a 10-year mine life, the thinnest combination among the senior producers covered here, which means tonnes rather than grade must do the work and any dilution bites directly into cost per ounce. Mine life of a decade leaves little margin for a delayed development project, and Great Bear does not pour gold until late 2029. The FY2026 guidance is the more immediate warning: output is guided to 1.84 to 1.86 Moz, below the 1.97 Moz delivered in FY2025, while all-in sustaining cost is guided to 1,850 to 1,900 USD/oz against 1,571 USD/oz in FY2025. Capex rises from 1.1752 USD bn attributable in FY2025 to 1.5 USD bn plus or minus 5% in FY2026, so the company is spending more, producing less and carrying a higher unit cost into the next year. Jurisdiction adds a second layer: Tasiast at 0.55 Moz is the only operating asset outside the OECD, and it is also the highest-margin mine in the portfolio, a pairing that concentrates both return and risk in one country.
上市市場數據
2 商家列表 · 每週更新歷史走勢 →- 市值
- $235億
- 股價
- CAD 27.82
- 一年漲跌
- -15.4%
- 近期漲跌
- -3.2%
- 較首個收盤價
- -19.5%
- 營收(近 12 個月)
- US$7.1 B(2025 財年)
11-02 → 11-03
起始 2025-09
財務歷史
完整市值歷史- 2026-11CAD 27.82$245億-1.2%
- 2026-10CAD 28.16$248億-17.9%
- 2026-09CAD 34.30$302億-19.2%
- 2026-08CAD 42.44$374億+31.3%
- 2026-07CAD 32.32$285億-3.8%
- 2026-06CAD 33.58$296億-19.8%
- 2026-05CAD 41.88$369億+1.8%
- 2026-04CAD 41.15$363億-3.2%
- 2026-03CAD 42.53$375億-15.6%
- 2026-02CAD 50.42$445億+17.6%
- 2026-01CAD 42.88$378億+10.9%
- 2025-12CAD 38.66$341億—
持股與控制權
最新可用申報- 控股實體
- 公開發行持股——未披露控股股東
- 公司類型
- 企業
- 內部人
- —
- 機構投資者
- —
- 自由流通股
- —
百分比按總發行股數計算,資料彙整自 Yahoo Finance 的 13F 類申報。機構數據反映在美國申報的持倉,可能低估在其他地區申報的持有人。未披露者不予列示。
媒體報導
全部報導 →5 最新頭條- Kinross Q3 Earnings Call Highlights '26 Guidance and Project Spendingtradingview.com2026-11-03
- Kinross Gold (TSX:K): How Far Can Gold Sales Per Employee Carry a Producer Through Rising Costskalkine.ca2026-11-03
- Kinross reports 2026 third-quarter resultskinross.com2026-10-28
- Kinross reports 2025 fourth-quarter and full-year resultskinross.com2026-02-18
- Kinross reports strong 2025 third-quarter resultskinross.com2025-11-04
• Paracatu in Minas Gerais is the group's largest open pit at 0.58 Moz and has been the volume anchor for years
• Tasiast in Mauritania adds 0.55 Moz from a high-margin pit and a 24,000 tonne per day mill
• Four smaller operations, Fort Knox at 0.38 Moz, Round Mountain at 0.22 Moz, La Coipa at 0.2 Moz and Bald Mountain at 0.18 Moz, fill out the rest Cost Curve Position – 1,571 USD/oz in FY2025, 1,850 to 1,900 guided for FY2026
• FY2025 all-in sustaining cost of 1,571 USD/oz and cash cost of 1,135 USD/oz sat mid-curve against a realised 3,423 USD/oz
• The FY2026 step-up to 1,850 to 1,900 USD/oz arrives with output guided down to 1.84 to 1.86 Moz from 1.97 Moz
• Attributable capex rises from 1.1752 USD bn in FY2025 to 1.5 USD bn plus or minus 5% in FY2026 Reserve Base – 20.9 Moz at 0.85 g/t over ten years
• The 20.9 Moz gold reserve at 0.85 g/t is low grade and bulky, so throughput rather than head grade drives the ounce count
• Silver adds 11.6 Moz at 27.7 g/t with the same 10-year life and contributes 1.6% of revenue
• A 10-year reserve life is the shortest in the senior peer group and puts Great Bear on the critical path Development Pipeline – Great Bear, Redbird 1 and Curlew Basin
• Great Bear in Red Lake, Ontario, is a 0.5 Moz open-pit and underground project targeting late-2029 startup
• Bald Mountain poured first gold at the Redbird 1 expansion in October 2026, adding near-term ounces in Nevada
• Curlew Basin in Washington and Lobo-Marte in Chile sit behind those as longer-dated options Hedges and Currency – Gold open, costs partly locked
• No gold hedging and no plan to add any, so the full spot price passes into revenue
• Foreign currency exposures in BRL, CLP and CAD are selectively hedged, protecting the operating cost line
• Roughly 50% of 2027 oil exposure is hedged, which caps part of the diesel risk that hits every open pit
| 財年 | 營業收入 | 淨利潤 |
|---|---|---|
| 2025 | $70.5億 | $23.9億 |
| 2024 | $51.5億 | $9.5億 |
| 2023 | $42.4億 | $4.2億 |
| 2022 | $34.6億 | — |
| 2021 | $26億 | $2.2億 |
數據來自公司年報(SEC XBRL),統一折算為美元。
快速概覽
總部
25 York Street, 17th Floor, Toronto, Ontario, M5J 2V5, Canada
成立
1993
員工
7,100
營收
US$7.1 B(2025 財年)
市值
$235億
上市
TSX: K, NYSE: KGC
類別
Related
Similar listed companies
- 必和必拓集團· $2087億
- Southern Copper Corporation· $1480億
- 力拓集團· $1452億
- China Shenhua Energy Company Limited· $1399億
- 紫金礦業· $1161億
- 紐蒙特公司· $1123億
數據來源與方法論
本企業簡介彙整自公開來源,包括公司年報、SEC/監管申報文件、官方新聞稿及經核實的第三方產業資料庫。財務數據反映最近一個財政年度之披露,並經多個獨立來源交叉驗證。
維瑞評級 評分採用專有多維模型計算,評估市場地位、財務實力、營運規模、創新能力與品牌影響力。各維度分數已相對於同業標準化,並每季更新。
免責聲明: 本簡介僅供參考。維瑞評級不對其完整性或時效性作任何保證。本內容不構成投資建議或背書。
主要參考資料: 官方網站 , FY2025 and FY2024 income statement, balance sheet, production (2,012,106 Au eq. oz.), AISC ($1,571/oz), realized gold pr Kinross Gold 2025 Annual Report 5-year financial summary (FY2021-FY2025 continuing operations revenue and operating earn FY2025 Annual Information Form (Form 40-F Exhibit 99.1): total employees (~7,100 at December 31, 2025) and NI 43-101 min FY2025 Management's Discussion and Analysis (Form 40-F Exhibit 99.2): segment ownership, silver ounces sold (2,830 koz), Q3 2026 operating results (424,693 Au eq. oz., $1,947/oz AISC, $2.6B cash, $1.9B net cash) and updated FY2026 guidance ( FY2023 and FY2022 comparative financial statements (revenue, operating income, net income of $416.3M in FY2023, total as TSX:K share price (CAD 27.82), market capitalization (CAD 34.09 billion / USD 24.53 billion), and institutional ETF owne
